Winchester and Potomac Railroad

El directorio enciclopédico desde la Wikipedia.

The Winchester and Potomac Railroad (W&PRR) was an historic railroad in the Southern United States, which ran from Winchester, Virginia to the Baltimore and Ohio Railroad (B&ORR) junction at Harpers Ferry on the Potomac River[1]. The W&P Railroad is now incorporated into the modern CSX Transportation Class I railroad. It played a key role in early train raids of the B&ORR during the beginning months of the American Civil War[2].

Railroads of the Confederacy

Contents

[edit] Founding and early history

Most railroads built in Virginia before the American Civil War connected farming and industrial centers to ports such as Alexandria, Virginia and Norfolk, Virginia. Towns west of the Blue Ridge Mountains needed rail transportation to connect with port cities but were hampered by the ability to cross the mountains. When the newly formed B&ORR was planned to cut across the northern end of the lower Shenandoah Valley, the Virginia General Assembly chartered the W&P Railroad in 1831. Routes were then surveyed by the U.S. Topographical Engineers of the U.S. Army Engineering Corps from 1831 to 1832. After the B&ORR was completed to Harpers Ferry in 1834 construction of the W&PRR began in 1835 and was completed by 1836, beginning its first operations on March 14 of that year. Final rail connection into the B&ORR was completed in January 1837 when the southernmost Winchester and Potomac Railroad Bridge was completed across the Potomac River tying the lines together in a junction on the Maryland side of the river.[3]

The Bollman truss bridge that connected the north end of the Winchester and Potomac Railroad into the Baltimore and Ohio Railroad toward the end of the Civil War

The W&PRR was a 4 foot 8 inch gauge with rails of 16.5 pounds-per-yard flat bar constructed upon ties cut from white oak and locust. The line ran 32 miles with another 2.5 miles of sidings and turnouts. The railroad terminated at the corner of Water and Market Streets in Winchester. The Winchester depot immediately became a key economic hub serving merchant traders in Winchester for commodities such as wheat, hide, fur, tobacco and hemp. The north end of the rail line also served the thriving industrial town of Virginius Island, which sat astride the Shenandoah Canal on the south side of Harpers Ferry.

Stations on the Winchester & Potomac Railroad (W&PRR)
Station Distance
Harpers Ferry, West Virginia 0 miles
Halltown, West Virginia 4 miles
Charlestown, West Virginia 7 miles
Summit Point, West Virginia 11 miles
Wadesville, Virginia 20 miles
Stephenson, Virginia 24 miles
Winchester, Virginia 29 miles

This connection to the B&ORR caused much concern politically, since this potentially enabled all farming and industrial produce in the Great Appalachian Valley region of Virginia to ship out of ports in Baltimore, Maryland and Philadelphia, Pennsylvania rather than through Virginian ports. Therefore this railroad was not authorized for connections further south. Those southern portions of the Shenandoah Valley were served later by other railways such as the Manassas Gap Railroad which connected Mount Jackson, Virginia to the Manassas Junction on the Orange and Alexandria Railroad and the Virginia Central Railroad which connected Staunton, Virginia to Richmond, Virginia.

[edit] John Brown's raid

The W&PRR was threatened during the events following John Brown's raid, and was a possible avenue for either an invasion into Virginia, or for a rescue operation of John Brown and other prisoners. The Governor of Virginia sent this notice to John Garrett, president of the Baltimore & Ohio, concerning Virginia Militia shutdown and control of both the W&PRR and B&O in connection with the raid in 1859.

Executive Department,
Richmond, 28th Nov., 1859.
J. W. Garrett, Esq.,

President, &c.
From information in possession of the Governor, of a contemplated attempt to rescue the prisoners condemned to death at Charlestown, he has deemed it proper to issue a proclamation taking possession of the Winchester & Potomac Railroad, on the first, second and third days of December next, and it will be held under impressment, with a guard, for the use and occupation of Virginia troops alone, and no transportation will be permitted other than for them. Under these circumstances, he requests me to suggest to you, as President of the Balt. & Ohio Railroad Company, the propriety of stopping all trains on your road on the first and second of December, other than for carrying the United States mail. Passengers coming through Virginia on those days will not be permitted to pass. Major General Taliaferro, in command at Charlestown, has orders to this effect.
GEO. W. MUMFORD,
Secretary of the Commonwealth

[edit] American Civil War

Norris 4x4x0 locomotive suspension such as used on the Ancient, Virginia and Potomac locomotives

By the start of the Civil War in 1861, W&PRR owned six locomotives: Ancient, Pocahontas, Farmer, President, Virginia and Potomac, all of which were 4x4x0 except for Farmer which was 4x2x0. Rolling stock included four passenger cars, one mail/baggage car, forty freight cars and eight repair cars. Officers of the company included William L. Clark, President and Chief Engineer Thomas Robinson Sharp. On June 18, 1861 the W&PRR Chief Engineer Sharp was commissioned a Captain in the Confederate States Army and was instrumental in various railroad operations, constructions and raids for the Confederacy and the Army of Northern Virginia, especially under Stonewall Jackson.

[edit] 1861

The W&PRR was of potential value to the Confederates for any need to attack Harpers Ferry[4], and did serve a useful roll in the movement of Virginia Militia troops to defensives positions in and about Harpers Ferry.[5] Although it could potentially be used to feed Confederate forces into the defenses of western Virginia via the B&ORR, by running along the northern border of the Confederate States, it would have been vulnerable to attack, possibly stranding large units to the west. So, due to its very northern location, and mere spur-like connection to the B&ORR, its overall potential usefulness to the Confederacy was not great.[4]. The greatest use and value in the W&PRR came in the first eight months of the war, from May, 1861 to January 1862 when it was heavily utilized to ship machinery from the Harpers Ferry arsenal down to Winchester, and from there overland to Strasburg and the Manassas Gap Railroad.[6]

The W&PRR was a key asset used during the Great Train Raid of 1861 when Stonewall Jackson raided the B&ORR removing, capturing or burning a total of 67 locomotives[7] and 386 railway cars, and taking 19[8] of those locomotives and at least 80 railroad cars onto Confederate railroads. After initially trapping this rolling stock on the Virginia-controlled portion of the B&ORR, Jackson immediately "helped himself to four small locomotives not too heavy for the flimsy flat-bar rails of the Winchester & Potomac, and had them sent to Winchester"[2] where they were disassembled near Fort Collier, mounted onto special dollies and wagons, and hauled by 40-horse teams "down the Valley turnpike to the [Manassas Gap] railroad at Strasburg"[7], reassembled and placed back on the tracks "which connected with the Virginia Central and the entire railroad system of the Confederacy."[9]. Through this event, the Chief Engineer of the W&PRR, Thomas R. Sharp, became heavily involved with what was later referred to as the "railroad corps" of the Confederacy, disassembling and moving other locomotives, cars, rails, ties, and machinery from the B&ORR to Winchester for storage and subsequent removal deeper into Confederate territory. His success in the raid at the end of May, 1861 by taking the four small locomotives over his railroad to Winchester earned him a commission as a Captain in the quartermaster service on June 18, 1861, and the new task of removing as many as possible of the remaining locomotives and rail cars still stranded up in Martinsburg.[8]

Throughout the summer and fall of 1861, Capt Thomas Sharp was busy supervising the removal of trains, equipment, rails and ties from the B&ORR, the "South's one unfailing source of supply"[10]. After the big summer campaigns of 1861 were mostly finished, Stonewall Jackson returned to Winchester and continued in his devotion of energy to "uprooting track west of Martinsburg" and were "able to deliver 3,000 tons of Baltimore & Ohio rails to the Winchester & Potomac Railroad in December, 1861."[11]

[edit] 1862

In the opening months and winter of 1862 most of the Baltimore & Ohio rolling stock and rail ties that had been captured and stored in Winchester, with the help of W&P Railroaders, were evacuated and used in various other Confederate railroads, such as the Centreville Military Railroad. The W&PRR at that point, however, had very little transportation value for either Confederate or Union forces for the rest of the war, and was not used by the Confederacy anymore after the spring of 1862[12] when it was seized by Union forces under Major General Nathaniel P. Banks.[13]

Both the western portion of the Manassas Gap Railroad and the W&P Railroad were effectively under the control of Banks in the spring, and were going to be used as part of a plan developed by Major General George B. McClellan to support Union operations in that area. McClellan's plan was to connect the Manassas Gap Railroad and the W&PRR with a line between Winchester, Virginia and Strasburg, Virginia, creating a "complete circle of rails" from the Union capital at Washington, D.C. to the Shenandoah Valley by either the Baltimore & Ohio Railroad or the Orange and Alexandria Railroad.[14]

Sometime in 1862, likely when McClellan occupied and controlled the W&PRR, its locomotives Ancient and President were captured, and later sold after the war. The Ancient was sold to J. Neilson in 1865 and the President was sold to the West Jersey and Atlantic Railroad.

Late in May, as Stonewall Jackson was busy routing the Fifth Corps under Banks, the B&ORR was shipping troops forward to Banks. "A troop train, in fact, arrived at Winchester [on the W&PRR] just as Banks began his retreat. Three companies got off and the remainder of the regiment rode back to Harpers Ferry."[15] As Banks retreated from Winchester, the Confederates occupied the northern Shenandoah Valley, burned the W&PRR's principal bridges, and tore up all the track. After Jackson evacuated the area in early June, the Union Army began repairing the W&PRR, but heavy rains washed the bridges out, and the W&PRR was not restored to service until June 20, 1862.[16]

In August 1862, as Major General John Pope was busy retreating and being defeated by General Lee in the Northern Virginia Campaign, Confederate intelligence learned that the W&PRR and the Baltimore & Ohio were being used to bring reinforcements to Pope. Reverend J. W. Jones of Charles Town, Virginia reported that the Northern government was using the railroad for that purpose, and this was confirmed three days later when Major General J.E.B. Stuart captured papers and letters belonging to Pope in a raid on his headquarters.[17]

Also in August, Confederate Lieutenants George Baylor and Milton Rousss of Company B, 12th Virginia Cavalry, led a small raid attacking the W&PRR between Summit Point and Cameron's Depot, capturing eight Union soldiers, $4,000 in cash and food supplies.

Following the Battle of Sharpsburg in the 1862 Maryland Campaign, the Confederate States Army once again controlled the northern Shenandoah Valley for a brief time. The Confederates wanted to remove all the new rails laid down on the W&PRR, but due to a lack of wagons, were unable to take it.[18]. Therefore, General Robert E. Lee ordered Major General Lafayette McLaws' division to once again destroy the W&PRR in order to foil any attempt by McClellan to follow the Army of Northern Virginia. McClellan, meanwhile, on October 10, was making arrangements with the Baltimore & Ohio to reconstruct the W&PRR with heavier duty T-rails, locomotives and trains for planned future Union Army operations. The Baltimore & Ohio evaluated McClellans plan, and replied that they did not have either the ties or rails to do the job, and that it would take at least six weeks to do the job, recommending that the Manassas Gap Railroad be repaired instead.[19] McClellan then abandoned his plan to upgrade the W&PRR on October 12, and after a reconnaissance by Brigadier General A. A. Humphreys on October 19, the Union Army discovered that the W&PRR had been destroyed by the Confederates, making the upgrade plan even more unfeasible.[18]

[edit] 1863

During the first half of 1863 the terminus of the W&PRR, Winchester, Virginia, was occupied by Major General Robert H. Milroy, who made no use of the railroad. Resistance to occupation in the Valley began to grow, and the 43rd Battalion Virginia Cavalry was stood up in that area under Major John S. Mosby, also known as the "Gray Ghost". On June 15th, after a sweeping rout of Milroy in the Second Battle of Winchester, the Confederates once again controlled the northern Shenandoah Valley as they marched to the Potomac River during the Gettysburg Campaign. Two days later "Captain T. B. Lee of the Corps of Engineers, C.S.A., was ordered to proceed to the lines of the Winchester & Potomac and the Baltimore & Ohio to collect any machinery, tools, rolling stock, or portions thereof which fell into Confederate hands. He was instructed to arrange with Lee's chief quartermaster, Colonel J. L. Corley, for men and wagons to transport the material down the Valley turnpike."[20] By the end of 1863 the W&PRR had been practically and nearly completely destroyed by the actions of armies on both sides, and the Confederates, who remained in loose control of the Valley, had no desire to repair or use the railroad, but rather desired to keep it inoperational.

[edit] 1864

In March and April 1864 Union forces, observed by Colonel John S. Mosby, were surveying the W&PRR and began repairing the road and laying rails, in preparation for advancements into the Valley. This report was relayed by Major General J.E.B. Stuart to General Robert E. Lee saying “It is stated that preparations are making to rebuild the [W&P] railroad from Harper’s Ferry to Winchester, which would indicated a reoccupation of the latter place. The Baltimore & Ohio Railroad is very closely guarded along its whole extant. No ingress or egress from their lines is permitted to citizens as heretofore, and everything shows secrecy & preparation.” The W&P Railroad was not actually re-opened by the Union for service until later in 1864.

After Major General Philip Sheridan pursued Lieutenant General Jubal A. Early south in the Shenandoah Valley, clearing the north end of Confederate forces, the Union Army set about, once again, and for the last time, repairing the W&PRR, reconstructing 28 miles of roadway to serve Sheridan.[21]

[edit] 1865

Haprpers Ferry in 1865, and the north terminus of the Winchester & Potomac Railroad

The W&PRR remained in Union Army control through the first half of 1865, and was the next to last of the Virginia railroads to be turned over to the Virginia Board of Public Works, sometime after June 30.[21]

[edit] Post Bellum

Following the war, in 1866 the railroad was returned to the company and stock holders, who decided to simply lease the right–of-way to the B&O Railroad. Then, in 1867 the new Winchester and Strasburg Railroad was built which connected Harpers Ferry, West Virginia to the Manassas Gap Railroad in place at Strasburg, Virginia enabling a connection up the Shenandoah Valley to Harrisonburg, Virginia. Eventually the Baltimore & Ohio "purchased the Winchester & Potomac" and "constructed a line the length of the Valley" to Lexington, Virginia where it joined a spur of the Chesapeake and Ohio Railroad.[22] Throughout Reconstruction northern railroad companies were able to charter new lines and construct railroads that connected the entire Shenandoah Valley north into Pennsylvania and south into Tennessee and North Carolina.

In 1896 the United States Supreme Court ruled in a lawsuit, overturning a previous judgment in favor of W&P Railroad Company for $30,340 for the value of the iron rails that were removed in 1862 during the American Civil War. The W&P Railroad Company claimed that its stock owners were loyal citizens during the war, and that the United States had taken possession and control of the valley up to Winchester, and then had removed its strap and T rails over to the Manassas Gap Railroad for service, as well as storage in Alexandria, Virginia and they were never returned. Furthermore, W&P Railroad had paid Manassas Gap Railroad $25,000 in 1874 for rails that had been put on to the W&P Railroad.

[edit] Modern Times

Trestle bridge of old Winchester & Potomac Railroad, now part of CSX Transportation, in Harpers Ferry

In 1902 the W&P Railroad was acquired by B&O Railroad, marking 71 years of total existence for the W&P Railroad. Later the B&O Railroad sold the railine to the Roanoke, Belmont and Occidental Railroad and was used in their Eastern Division until 1964. The line finally became a line under the Shenandoah Subdivision of CSX Transportation.

[edit] See also

[edit] Notes

  1. ^ Black, p. xxiii
  2. ^ a b Johnston, p.23
  3. ^ Reynolds, p.18
  4. ^ a b Johnston, p.5
  5. ^ Tucker, p.33
  6. ^ Johnston, p.257
  7. ^ a b Johnston, p.24
  8. ^ a b Shriver
  9. ^ Hungerford, Vol II, p.7
  10. ^ Johnston, p.36
  11. ^ Johnston, p.36 citing Official Records, II, pp.981,987
  12. ^ Johnston, p.43
  13. ^ Black, p.86
  14. ^ Johnston, p. 50; "McClellan's idea was expressed in a letter to Secretary of War Stanton on March 28, 1862."
  15. ^ Johnston, p.270
  16. ^ Johnston, p.54
  17. ^ Johnston, pp.277-278
  18. ^ a b Johnston, p.282
  19. ^ Johnston, pp.104-105
  20. ^ Johnston, p.291
  21. ^ a b Johnston, p.253
  22. ^ Johnston, p.269

[edit] References

  • Black, Robert C. The Railroads of the Confederacy. The University of North Carolina Press, originally 1952.
  • Johnston II, Angus James, Virginia Railroads in the Civil War, University of North Carolina Press for the Virginia Historical Society, 1961.
  • Reynolds, Kirk and Oroszi, Dave, Baltimore and Ohio Railroad, MBI, April, 2000, ISBN 0760307466
  • Shriver, Ernest, Stealing Railroad Engines, from Tales from McClure's War: Being True Stories of Camp and Battlefield, New York, Doubleday & McClure Co., 1898.
  • Tucker, Spencer C., Brigadier General John D. Imboden: Confederate Commander in the Shenandoah, University Press of Kentucky, 2002, ISBN 081312266X

[edit] External links

Página espejo de la Wikipedia
Directorio de Enlaces Directorio dmoz Directorio espejo dmoz Pedro Bernardo