|
This list contains all spacewalks and moonwalks where an astronaut has fully, or partially left his spacecraft. All spacewalks have had the astronauts tethered to their spacecraft except for seven spacewalks by the United States, (six in 1984 using the Manned Maneuvering Unit, one in 1994 testing the SAFER rescue device). All moonwalks saw astronauts untethered, and some had astronauts traveling far enough to lose visual contact with their craft (they were up to 7.6 km away from it using the Lunar Rover). As of October 26, 2007, 168 astronauts had made spacewalks (out of 464 astronauts who have gone into space).[1][2] Only 10 women have been on spacewalks, at least partly because the EVA suits are designed for a larger male frame.[3][4]
[edit] Spacewalks and moonwalks
Spacewalk beginning and ending times are given in Coordinated Universal Time (UTC).
| No. |
Spacecraft |
Spacewalker |
Start - UTC |
End - UTC |
Duration |
Comments |
| 1. |
Voskhod 2 |
Alexei Leonov |
March 18, 1965,
08:34:51 |
March 18, 1965,
08:47:00 |
0 h, 24 min |
First EVA |
| 2. |
Gemini 4 |
Edward White |
June 3, 1965,
19:46:00 |
June 3, 1965,
20:06:00 |
0 h, 20 min |
Second EVA |
|
| 3. |
Gemini 9A |
Gene Cernan |
June 5, 1966,
15:02:00 |
June 5, 1966,
17:09:00 |
2 h, 7 min |
Complex EVA, Visor fogged |
| 4. |
Gemini 10 - EVA 1 |
Michael Collins |
July 19, 1966,
21:44:00 |
July 19, 1966,
22:33:00 |
0 h, 49 min |
Stand up EVA |
| 5. |
Gemini 10 - EVA 2 |
Michael Collins |
July 20, 1966,
23:01:00 |
July 20, 1966,
23:40:00 |
0 h, 39 min |
EVA to Agena 8 |
| 6. |
Gemini 11 - EVA 1 |
Richard Gordon |
September 13, 1966,
14:44:00 |
September 13, 1966,
15:17:00 |
0 h, 33 min |
Attached tether to Agena 11 |
| 7. |
Gemini 11 - EVA 2 |
Richard Gordon |
September 14, 1966,
12:49:00 |
September 14, 1966,
14:57:00 |
2 h, 08 min |
Stand up EVA - UV photos |
| 8. |
Gemini 12 - EVA 1 |
Buzz Aldrin |
November 12, 1966,
16:15:00 |
November 12, 1966,
18:44:00 |
2 h, 29 min |
Stand Up EVA - UV photos |
| 9. |
Gemini 12 - EVA 2 |
Buzz Aldrin |
November 13, 1966,
15:34:00 |
November 13, 1966,
17:40:00 |
2 h, 06 min |
Complex EVA tests |
| 10. |
Gemini 12 - EVA 3 |
Buzz Aldrin |
November 14, 1966,
14:52:00 |
November 14, 1966,
15:47:00 |
0 h, 55 min |
Stand Up EVA - UV photos |
|
| 11. |
Soyuz 4 & Soyuz 5 |
Yevgeny Khrunov,
Aleksei Yeliseyev |
January 16, 1969,
12:43:00 |
January 16, 1969,
01:15:00 |
0 h, 37 min |
First two-person spacewalk; Transferred from Soyuz 5 to 4 |
| 12. |
Apollo 9 |
David Scott (Stand up only),
Rusty Schweickart |
March 6, 1969,
16:45:00 |
March 6, 1969,
18:02:00 |
1 h, 17 min |
Tested lunar spacesuit |
| 13. |
Apollo 11 - Moonwalk |
Neil Armstrong,
Buzz Aldrin |
July 21, 1969,
02:39:33 |
July 21, 1969,
05:11:39 |
2 h, 31 min, 40 s |
First moonwalk |
| 14. |
Apollo 12 - 1st Moonwalk |
Pete Conrad,
Alan Bean |
November 19, 1969,
11:32:35 |
November 19, 1969,
15:28:38 |
3 h, 56 min, 03 s |
Deploy ALSEP |
| 15. |
Apollo 12 - 2nd Moonwalk |
Conrad,
Bean |
November 20, 1969,
03:54:45 |
November 20, 1969,
07:44:00 |
3 h, 49 min, 15 s |
Collect Surveyor 3 samples |
|
| 16. |
Apollo 14 - 1st Moonwalk |
Alan Shepard,
Edgar Mitchell |
February 5, 1971,
14:42:13 |
February 5, 1971,
19:30:50 |
4 h, 47 min, 50 s |
Deploy ALSEP |
| 17. |
Apollo 14 - 2nd Moonwalk |
Shepard,
Mitchell |
February 6, 1971,
08:11:15 |
February 6, 1971,
12:45:56 |
4 h, 34 min, 41 s |
Explore to Cone crater |
| 18. |
Apollo 15 - Stand up EVA |
David Scott |
July 31, 1971,
00:16:49 |
July 31, 1971,
00:49:56 |
33 min, 07 s |
Stand up EVA, LM top hatch |
| 19. |
Apollo 15 - 1st Moonwalk |
David Scott,
James Irwin |
July 31, 1971,
13:12:17 |
July 31, 1971,
19:45:59 |
6 h, 32 min, 42 s |
Deploy LRV & ALSEP |
| 20. |
Apollo 15 - 2nd Moonwalk |
David Scott,
Irwin |
August 1, 1971,
11:48:48 |
August 1, 1971,
19:01:02 |
7 h, 12 min, 14 s |
Traverse to Mt. Hadley Delta |
| 21. |
Apollo 15 - 3rd Moonwalk |
David Scott,
Irwin |
August 2, 1971,
08:52:14 |
August 2, 1971,
13:42:04 |
4 h, 49 min, 50 s |
Traverse to Hadley Rille |
| 22. |
Apollo 15 - Transearth EVA |
Irwin (Stand up only),
Alfred Worden |
August 5, 1971,
15:31:12 |
August 5, 1971,
16:10:19 |
39 min, 07 s |
Retrieve SIM bay film |
|
| 23. |
Apollo 16 - 1st Moonwalk |
John W. Young,
Charles Duke |
April 21, 1972,
16:47:28 |
April 21, 1972,
23:58:40 |
7 h, 11 min, 02 s |
Deploy LRV & ALSEP |
| 24. |
Apollo 16 - 2nd Moonwalk |
Young,
Duke |
April 22, 1972,
16:33:35 |
April 22, 1972,
23:56:44 |
7 h, 23 min, 09 s |
Traverse to Stone Mtn. |
| 25. |
Apollo 16 - 3rd Moonwalk |
Young,
Duke |
April 23, 1972,
15:25:28 |
April 23, 1972,
21:05:31 |
5 h, 40 min, 03 s |
Traverse to Smokey Mtn. |
| 26. |
Apollo 16 - Transearth EVA |
Duke (Stand up only),
Thomas Mattingly |
April 25, 1972,
20:33:46 |
April 25, 1972,
21:57:28 |
1 h, 23 min, 42 s |
Retrieve SIM bay film |
| 27. |
Apollo 17 - 1st Moonwalk |
Cernan,
Harrison Schmitt |
December 11, 1972,
23:54:49 |
December 12, 1972,
07:06:42 |
7 h, 11 min, 53 s |
Deploy LRV, ALSEP |
| 28. |
Apollo 17 - 2nd Moonwalk |
Cernan,
Schmitt |
December 12, 1972,
23:28:06 |
December 13, 1972,
07:05:02 |
7 h, 36 min, 56 s |
Traverse to South Massif |
| 29. |
Apollo 17 - 3rd Moonwalk |
Cernan,
Schmitt |
December 13, 1972,
22:25:48 |
December 14, 1972,
05:40:56 |
7 h, 15 min, 08 s |
Traverse to North Massif |
| 30. |
Apollo 17 - Transearth EVA |
Schmitt (Stand up only),
Ronald Evans |
December 17, 1972,
20:27:40 |
December 17, 1972,
21:33:24 |
1 h, 05 min, 44 s |
Retrieve SIM bay film |
|
| 31. |
Skylab 2 CM - EVA 1 |
Paul J. Weitz |
May 26, 1973,
00:40 |
May 26, 1973,
01:20 |
40 min |
Stand up EVA CM hatch |
| 32. |
Skylab 2 - EVA 2 |
Conrad,
Joseph Kerwin |
June 7, 1973,
15:15 |
June 7, 1973,
18:40 |
3 h, 25 min |
Open Solar Array |
| 33. |
Skylab 2 - EVA 3 |
Conrad,
Weitz |
June 19, 1973,
10:55 |
June 19, 1973,
12:31 |
1 h, 36 min |
Replace ATM film |
| 34. |
Skylab 3 - EVA 1 |
Owen Garriott,
Jack Lousma |
August 6, 1973,
17:30 |
August 7, 1973,
00:01 |
6 h, 31 min |
Install new Sunshade & Film |
| 35. |
Skylab 3 - EVA 2 |
Garriott,
Lousma |
August 24, 1973,
16:24 |
August 24, 1973,
20:55 |
4 h, 31 min |
Change ATM film, gyro |
| 36. |
Skylab 3 - EVA 3 |
Garriott,
Bean |
September 22, 1973,
11:18 |
September 22, 1973,
13:59 |
2 h, 41 min |
Change ATM film |
| 37. |
Skylab 4 - EVA 1 |
Edward Gibson,
William Pogue |
November 22, 1973,
17:42 |
November 23, 1973,
00:15 |
6 h, 33 min |
Repair antenna, photos |
| 38. |
Skylab 4 - EVA 2 |
Gerald Carr,
Pogue |
December 25, 1973,
16:00 |
December 25, 1973,
23:01 |
7 h, 01 min |
Comet Kohoutek photos, ATM film |
| 39. |
Skylab 4 - EVA 3 |
Carr,
Gibson |
December 29, 1973,
17:00 |
December 29, 1973,
20:29 |
3 h, 29 min |
Comet Kohoutek photos |
|
| 40. |
Skylab 4 - EVA 4 |
Carr,
Gibson |
February 3, 1974,
15:19 |
February 3, 1974,
20:38 |
5 h, 19 min |
Remove ATM film |
|
| 41. |
Salyut 6 - PE-1 |
Yuri Romanenko (Stand up only),
Georgi Grechko |
December 19, 1977,
21:36 |
December 19, 1977,
23:04 |
1 h, 28 min |
Test Russian Orlan-D spacesuit |
|
| 42. |
Salyut 6 - PE-2 |
Vladimir Kovalyonok (Stand up only),
Aleksandr Ivanchenkov |
July 29, 1978,
04:00 |
July 29, 1978,
06:20 |
2 h, 05 min |
Retrieve experiments |
|
| 43. |
Salyut 6 - PE-3 |
Valery Ryumin,
Vladimir Lyakhov |
August 15, 1979,
14:16 |
August 15, 1979,
15:39 |
1 h, 23 min |
Remove radio dish |
|
| 44. |
Salyut 7 - PE-1 |
Anatoli Berezovoy (Stand up only),
Valentin Lebedev |
July 30, 1982,
02:39 |
July 30, 1982,
05:12 |
2 h, 33 min |
Retrieve experiments |
|
| 45. |
STS-6 - EVA 1 |
Story Musgrave,
Donald Peterson |
April 7, 1983,
21:05 |
April 8, 1983,
01:15 |
4 h, 10 min |
Untethered EMU tests |
| 46. |
Salyut 7 - PE-2 - EVA 1 |
Lyakhov,
Aleksandr Pavlovich Aleksandrov |
November 1, 1983,
04:47 |
November 1, 1983,
07:36 |
2 h, 50 min |
Add solar array |
| 47. |
Salyut 7 - PE-2 - EVA 2 |
Lyakhov,
Alexandrov |
November 3, 1983,
03:47 |
November 3, 1983,
06:62 |
2 h, 55 min |
Add solar array |
|
| 48. |
STS-41-B - EVA 1 |
Bruce McCandless II,
Robert Stewart |
February 7, 1984 |
February 7, 1984 |
5 h, 55 min |
First untethered spacewalk, MMU tests; SMM repair rehearsal |
| 49. |
STS-41-B - EVA 2 |
McCandless,
Stewart |
February 9, 1984 |
February 9, 1984 |
6 h, 17 min |
MMU tests; SMM repair rehearsal |
| 50. |
STS-41-C - EVA 1 |
George Nelson,
James van Hoften |
April 8, 1984,
14:18 |
April 8, 1984,
16:56 |
2 h, 38 min |
Retrieve Solar Max |
| 51. |
STS-41-C - EVA 2 |
Nelson,
van Hoften |
April 11, 1984,
08:58 |
April 11, 1984,
15:42 |
6 h, 44 min |
Repair Solar Max |
| 52. |
Salyut 7 - PE-3 - EVA 1 |
Leonid Kizim,
Vladimir Solovyov |
April 23, 1984,
04:31 |
April 23, 1984,
08:46 |
4 h, 20 min |
ODU repair |
| 53. |
Salyut 7 - PE-3 - EVA 2 |
Kizim,
V. Solovyov |
April 26, 1984,
02:40 |
April 26, 1984,
07:40 |
4 h, 56 min |
Repair ODU |
| 54. |
Salyut 7 - PE-3 - EVA 3 |
Kizim,
V. Solovyov |
April 29, 1984,
01:35 |
April 29, 1984,
04:20 |
2 h, 45 min |
Repair ODU |
| 55. |
Salyut 7 - PE-3 - EVA 4 |
Kizim,
V. Solovyov |
May 3, 1984,
23:15 |
May 4, 1984,
02:00 |
2 h, 45 min |
Repair ODU |
| 56. |
Salyut 7 - PE-3 - EVA 4 |
Kizim,
V. Solovyov |
May 18, 1984,
17:52 |
May 18, 1984,
20:57 |
3 h, 05 min |
Add solar array |
| 57. |
Salyut 7 - VE-4 - EVA 5 |
Svetlana Savitskaya,
Vladimir Dzhanibekov |
July 25, 1984,
14:55 |
July 25, 1984,
18:29 |
3 h, 35 min |
First woman EVA |
| 58. |
Salyut 7 - PE-3 - EVA 6 |
Kizim,
V. Solovyov |
August 8, 1984,
08:46 |
August 8, 1984,
13:46 |
5 h, 00 min |
Complete ODU repair |
| 59. |
STS-41-G - EVA 1 |
David Leestma,
Kathryn D. Sullivan |
October 11, 1984 |
October 11, 1984 |
3 h, 29 min |
Test orbital refueling |
| 60. |
STS-51-A - EVA 1 |
Joseph P. Allen,
Dale Gardner |
November 12, 1984,
13:25 |
November 12, 1984,
19:25 |
6 h, 00 min |
Retrieve Palapa B-2 satellite |
| 61. |
STS-51-A - EVA 2 |
Allen,
Gardner |
November 14, 1984 - 11:09 |
November 14, 1984 - 16:51 |
5 h, 42 min |
Retrieve Westar VI |
|
| 62. |
STS-51-D - EVA 1 |
Jeffrey Hoffman,
Stanley Griggs |
April 16, 1985 |
April 16, 1985 |
3 h, 06 min |
Assist satellite repair |
| 63. |
Salyut 7 - PE-4 - EVA 1 |
Vladimir Dzhanibekov,
Viktor Savinykh |
August 2, 1985,
07:15 |
August 2, 1985,
12:15 |
5 h, 00 min |
Augment solar arrays |
| 64. |
STS-51-I - EVA 1 |
William Fisher,
van Hoften |
August 31, 1985 |
August 31, 1985 |
7 h, 20 min |
Retrieve Leasat 3 |
| 65. |
STS-51-I - EVA 2 |
Fisher,
van Hoften |
September 1, 1985 |
September 1, 1985 |
4 h, 26 min |
Release Leasat 3 |
| 66. |
STS-61-B - EVA 1 |
Jerry L. Ross,
Sherwood Spring |
November 29, 1985 |
November 29, 1985 |
5 h, 32 min |
Assemble EASE/ACCESS structure |
| 67. |
STS-61-B - EVA 2 |
Ross,
Spring |
December 1, 1985 |
December 1, 1985 |
6 h, 41 min |
Assemble EASE/ACCESS structure, test RMS |
|
| 68. |
Salyut 7 - PE-6 - EVA 1 |
Kizim,
V. Solovyov |
May 28, 1986,
05:43 |
May 28, 1986,
09:33 |
3 h, 50 min |
Test truss, retrieve samples |
| 69. |
Salyut 7 - PE-6 - EVA 2 |
Kizim,
V. Solovyov |
May 31, 1986,
04:57 |
May 31, 1986,
09:57 |
5 h, 00 min |
Test truss |
|
| 70. |
Mir PE-2 - EVA 1 |
Romanenko,
Aleksandr Laveykin |
April 11, 1987,
19:41 |
April 11, 1987,
23:21 |
3 h, 40 min |
Inspect Kvant docking |
| 71. |
Mir PE-2 - EVA 2 |
Romanenko,
Laveikin |
June 12, 1987,
16:55 |
June 12, 1987,
18:48 |
1 h, 53 min |
Install solar array |
| 72. |
Mir PE-2 - EVA 3 |
Romanenko,
Laveikin |
June 16, 1987,
15:30 |
June 16, 1987,
18:45 |
3 h, 15 min |
Install solar array |
|
| 73. |
Mir PE-3 - EVA 1 |
Vladimir G. Titov,
Musa Manarov |
February 26, 1988,
09:00 |
February 26, 1988,
13:55 |
4 h, 25 min |
Replace solar array |
| 74. |
Mir PE-3 - EVA 2 |
Titov,
Manarov |
June 30, 1988,
05:33 |
June 30, 1988,
10:43 |
5 h, 10 min |
Repair X-ray detector |
| 75. |
Mir PE-3 - EVA 3 |
Titov,
Manarov |
October 20, 1988,
05:59 |
October 20, 1988,
10:11 |
4 h, 12 min |
Repair X-ray telescope |
| 76. |
Mir PE-4 - EVA 1 |
Alexander A. Volkov,
Jean-Loup Chrétien |
December 9, 1988,
09:57 |
December 9, 1988,
15:57 |
6 h, 00 min |
First French EVA |
|
| 77. |
Mir PE-5 - EVA 1 |
Alexander Viktorenko,
Aleksandr Serebrov |
January 8, 1990,
20:23 |
January 8, 1990,
23:19 |
2 h, 56 min |
Install star trackers |
| 78. |
Mir PE-5 - EVA 2 |
Viktorenko,
Serebrov |
January 11, 1990,
18:01 |
January 11, 1990,
20:55 |
2 h, 54 min |
Modify Mir for Kvant 2 |
| 79. |
Mir PE-5 - EVA 3 |
Viktorenko,
Serebrov |
January 26, 1990,
12:09 |
January 26, 1990,
15:11 |
3 h, 02 min |
Test Orlan-DMA spacesuit |
| 80. |
Mir PE-5 - EVA 4 |
Viktorenko,
Serebrov |
February 1, 1990,
08:15 |
February 1, 1990,
13:14 |
4 h, 59 min |
Test SPK EVA device |
| 81. |
Mir PE-5 - EVA 5 |
Viktorenko,
Serebrov |
February 5, 1990,
06:08 |
February 5, 1990,
09:53 |
3 h, 45 min |
Test SPK EVA device |
| 82. |
Mir PE-6 - EVA 1 |
Anatoly Solovyev,
Aleksandr Balandin |
July 17, 1990,
13:06 |
July 17, 1990,
20:22 |
7 h, 00 min |
Repair Soyuz TM-9 insulation |
| 83. |
Mir PE-6 - EVA 2 |
A. Solovyov,
Balandin |
July 26, 1990,
11:15 |
July 26, 1990,
14:46 |
3 h, 31 min |
Inspect Kvant 2 hatch |
| 84. |
Mir PE-7 - EVA 1 |
Gennadi Manakov,
Gennady Strekalov |
October 29, 1990,
21:45 |
October 30, 1990,
00:30 |
2 h, 45 min |
Repair Kvant 2 hatch |
|
| 85. |
Mir PE-8 - EVA 1 |
Viktor M. Afanasyev,
Manarov |
January 7, 1991,
17:03 |
January 7, 1991,
22:21 |
5 h, 18 min |
Repair Kvant 2 hatch |
| 86. |
Mir PE-8 - EVA 2 |
Afanaseyev,
Manarov |
January 23, 1991,
10:59 |
January 23, 1991,
16:32 |
5 h, 33 min |
Install Stela boom |
| 87. |
Mir PE-8 - EVA 3 |
Afanaseyev,
Manarov |
January 26, 1991,
09:00 |
January 26, 1991,
15:20 |
6 h, 20 min |
Install solar array supports |
| 88. |
STS-37 - EVA 1 |
Ross,
Jerome Apt |
April 7, 1991, |
April 7, 1991, |
4 h, 26 min |
Deploy GRO antenna |
| 89. |
STS-37 - EVA 2 |
Ross,
Apt |
April 8, 1991, |
April 8, 1991, |
5 h, 47 min |
Test EVA equipment |
| 90. |
Mir PE-8 - EVA 4 |
Afanaseyev,
Manarov |
April 25, 1991,
20:29 |
April 26, 1991,
00:03 |
3 h, 34 min |
Inspect Kurs antenna |
| 91. |
Mir PE-9 - EVA 1 |
Anatoly Artsebarsky,
Sergei Krikalev |
June 24, 1991,
21:11 |
June 25, 1991,
02:09 |
4 h, 58 min |
Replace Kurs antenna |
| 92. |
Mir PE-9 - EVA 2 |
Artsebarski,
Krikalev |
June 28, 1991,
19:02 |
June 28, 1991,
22:26 |
3 h, 24 min |
Attach TREK experiment |
| 93. |
Mir PE-9 - EVA 3 |
Artsebarski,
Krikalev |
July 15, 1991,
11:45 |
July 15, 1991,
17:41 |
5 h, 56 min |
Prepare for Sofora girder |
| 94. |
Mir PE-9 - EVA 4 |
Artsebarski,
Krikalev |
July 19, 1991,
11:10 |
July 19, 1991,
16:38 |
5 h, 28 min |
Assemble Sofora girder |
| 95. |
Mir PE-9 - EVA 5 |
Artsebarski,
Krikalev |
July 23, 1991,
09:15 |
July 23, 1991,
14:57 |
5 h, 42 min |
Assemble Sofora girder |
| 96. |
Mir PE-9 - EVA 6 |
Artsebarski,
Krikalev |
July 27, 1991,
08:44 |
July 27, 1991,
15:33 |
6 h, 49 min |
Complete Sofora girder |
|
| 97. |
Mir PE-10 - EVA 1 |
Volkov,
Krikalev |
February 20, 1992,
20:09 |
February 21, 1992,
00:21 |
4 h, 12 min |
Maintain Mir |
| 98. |
STS-49 - EVA 1 |
Pierre Thuot,
Richard Hieb |
May 10, 1992,
20:40 |
May 11, 1992,
00:23 |
3 h, 43 min |
Retrieve Intelsat VI |
| 99. |
STS-49 - EVA 2 |
Thuot,
Hieb |
May 11, 1992,
21:05 |
May 12, 1992,
02:35 |
5 h, 30 min |
Repair Intelsat VI |
| 100. |
STS-49 - EVA 3 |
Thuot, Hieb
and Thomas Akers |
May 13, 1992,
21:17 |
May 14, 1992,
05:46 |
8 h, 29 min |
First three-person spacewalk; Retrieve, repair Intelsat VI |
| 101. |
STS-49 - EVA 4 |
Akers,
Kathryn Thornton |
May 14, 1992, ~21:00 |
May 15, 1992, ~04:45 |
7 h, 44 min |
Test space station equipment |
| 102. |
Mir PE-11 - EVA 1 |
Viktorenko,
Alexander Kaleri |
July 8, 1992,
12:38 |
July 8, 1992,
14:41 |
2 h, 03 min |
Inspect Kvant 2 gyrodynes |
| 103. |
Mir PE-12 - EVA 1 |
Sergei Avdeyev,
A. Solovyov |
September 3, 1992,
13:32 |
September 3, 1992,
17:28 |
3 h, 56 min |
Prepare to install VDU |
| 104. |
Mir PE-12 - EVA 2 |
Avdeyev,
A. Solovyov |
September 7, 1992,
11:47 |
September 7, 1992,
16:55 |
5 h, 08 min |
Install VDU on Sofora truss |
| 105. |
Mir PE-12 - EVA 3 |
Avdeyev,
A. Solovyov |
September 11, 1992,
10:06 |
September 11, 1992,
15:50 |
5 h, 44 min |
Install VDU on Sofora truss |
| 106. |
Mir PE-12 - EVA 4 |
Avdeyev,
A. Solovyov |
September 15, 1992,
07:49 |
September 15, 1992,
11:22 |
3 h, 33 min |
Move Kurs unit on Kristall |
|
| 107. |
STS-54 - EVA 1 |
Gregory Harbaugh,
Mario Runco |
January 17, 1993, |
January 17, 1993, |
4 h, 28 min |
Space Station Assembly tests |
| 108. |
Mir PE-13 - EVA 1 |
Manakov,
Alexander Poleshchuk |
April 19, 1993,
17:15 |
April 19, 1993,
22:40 |
5 h, 25 min |
Install solar arrays |
| 109. |
Mir PE-13 - EVA 2 |
Manakov,
Poleshchuk |
June 18, 1993,
17:25 |
June 18, 1993,
21:58 |
4 h, 33 min |
Install solar arrays |
| 110. |
STS-57 - EVA 1 |
George Low,
Peter Wisoff |
June 25, 1993, |
June 25, 1993, |
5 h, 50 min |
Practice EVA tasks |
| 111. |
Mir PE-14 - EVA 1 |
Vasili Tsibliyev,
Serebrov |
September 16, 1993,
05:57 |
September 16, 1993,
10:16 |
4 h, 18 min |
Prepare Rapana truss assembly |
| 112. |
STS-51 - EVA 1 |
James H. Newman,
Carl Walz |
September 16, 1993,
08:40 |
September 16, 1993,
15:45 |
7 h, 05 min |
Test Hubble Space Telescope repair tools |
| 113. |
Mir PE-14 - EVA 2 |
Tsibliyev,
Serebrov |
September 20, 1993,
03:51:50 |
September 20, 1993,
07:05:40 |
3 h, 13 min |
Assemble Rapana truss |
| 114. |
Mir PE-14 - EVA 3 |
Tsibliyev,
Serebrov |
September 28, 1993,
00:57 |
September 28, 1993,
02:48 |
1 h, 52 min |
Inspect Mir exterior |
| 115. |
Mir PE-14 - EVA 4 |
Tsibliyev,
Serebrov |
October 22, 1993,
15:47 |
October 22, 1993,
16:25 |
0 h, 38 min |
Inspect Mir exterior |
| 116. |
Mir PE-14 - EVA 5 |
Tsibliyev,
Serebrov |
October 29, 1993,
13:38 |
October 29, 1993,
17:50 |
4 h, 12 min |
Inspect Mir exterior |
| 117. |
STS-61 - EVA 1 |
Musgrave,
Hoffman |
December 5, 1993,
03:44 |
December 5, 1993,
11:38 |
7 h, 54 min |
Replace HST gyros |
| 118. |
STS-61 - EVA 2 |
Kathryn C. Thornton,
Akers |
December 6, 1993,
03:29 |
December 6, 1993,
10:05 |
6 h, 36 min |
Replace HST solar arrays |
| 119. |
STS-61 - EVA 3 |
Musgrave,
Hoffman |
December 7, 1993,
03:35 |
December 7, 1993,
10:22 |
6 h, 47 min |
Replace HST WFPC & WFPC-2 |
| 120. |
STS-61 - EVA 4 |
K. Thornton,
Akers |
December 8, 1993,
03:13 |
December 8, 1993,
10:03 |
7 h, 21 min |
Replace HST solar array drive |
| 121. |
STS-61 - EVA 5 |
Musgrave,
Hoffman |
December 9, 1993,
03:30 |
December 9, 1993,
10:51 |
7 h, 21 min |
Complete Hubble service |
|
| 122. |
Mir PE-16 - EVA 1 |
Yuri Malenchenko,
Talgat Musabayev |
September 9, 1994,
07:00 |
September 9, 1994,
12:06 |
5 h, 04 min |
Repair Soyuz thermal blanket |
| 123. |
Mir PE-16 - EVA 2 |
Malenchenko,
Musabayev |
September 13, 1994,
06:30 |
September 13, 1994,
12:32 |
6 h, 01 min |
Mir maintenance |
| 124. |
STS-64 - EVA 1 |
Mark C. Lee,
Carl Meade |
September 16, 1994,
14:42 |
September 16, 1994,
21:33 |
6 h, 51 min |
untethered spacewalk to test SAFER EVA device |
|
| 125. |
STS-63 - EVA 1 |
Michael Foale,
Bernard Harris |
February 9, 1995,
11:56 |
February 9, 1995,
16:35 |
4 h, 39 min |
Tests for International Space Station assembly |
| 126. |
Mir PE-18 - EVA 1 |
Vladimir N. Dezhurov,
Strekalov |
May 12, 1995,
04:20:44 |
May 12, 1995,
10:35:16 |
6 h, 14 min, 32 s |
Move Solar Arrays to Kvant |
| 127. |
Mir PE-18 - EVA 2 |
Dezhurov,
Strekalov |
May 17, 1995,
02:38 |
May 17, 1995,
09:20 |
6 h, 52 min |
Install solar array on Kvant |
| 128. |
Mir PE-18 - EVA 3 |
Dezhurov,
Strekalov |
May 22, 1995,
00:10:20 |
May 22, 1995,
05:25:11 |
5 h, 14 min, 51 s |
Install solar array on Kvant |
| 129. |
Mir PE-18 - EVA 4 |
Dezhurov,
Strekalov |
May 28, 1995,
22:22 |
May 28, 1995,
22:43 |
0 h, 21 min |
Prepare Mir to move Kristall |
| 130. |
Mir PE-18 - EVA 5 |
Dezhurov,
Strekalov |
June 1, 1995,
22:05:30 |
June 1, 1995,
22:28:20 |
0 h, 23 min, 50 s |
Prepare Mir to move Spektr |
| 131. |
Mir PE-19 - EVA 1 |
A. Solovyov,
Nikolai Budarin |
July 14, 1995,
03:56 |
July 14, 1995,
09:30 |
5 h, 34 min |
Deploy Spektr solar array |
| 132. |
Mir PE-19 - EVA 2 |
A. Solovyov,
Budarin |
July 19, 1995,
00:39 |
July 19, 1995,
03:47 |
3 h, 08 min |
Install MIRAS spectrometer |
| 133. |
Mir PE-19 - EVA 3 |
A. Solovyov,
Budarin |
July 21, 1995,
00:28 |
July 21, 1995,
06:18 |
5 h, 35 min |
Install MIRAS spectrometer |
| 134. |
STS-69 - EVA 1 |
James S. Voss,
Michael Gernhardt |
September 16, 1995,
08:20 |
September 16, 1995,
15:06 |
6 h, 46 min |
Practice ISS assembly |
| 135. |
Mir PE-20 - EVA 1 |
Avdeyev,
Thomas Reiter |
October 20, 1995,
11:50 |
October 20, 1995,
17:06 |
5 h, 16 min |
First ESA EVA |
| 136. |
Mir PE-20 - EVA 2 |
Avdeyev,
Yuri Gidzenko |
December 8, 1995,
19:23 |
December 8, 1995,
19:52 |
0 h, 37 min |
Transfer docking cone |
|
| 137. |
STS-72 - EVA 1 |
Leroy Chiao,
Daniel Barry |
January 15, 1996,
05:35 |
January 15, 1996,
11:44 |
6 h, 09 min |
Practice ISS assembly |
| 138. |
STS-72 - EVA 2 |
Chiao,
Winston E. Scott |
January 17, 1996,
05:40 |
January 17, 1996,
12:34 |
6 h, 53 min |
Practice ISS assembly |
| 139. |
Mir PE-20 - EVA 3 |
Reiter,
Gidzenko |
February 8, 1996,
14:03 |
February 8, 1996,
17:08 |
3 h, 06 min |
Repair Kvant 2 antenna |
| 140. |
Mir PE-21 - EVA 1 |
Yuri Onufrienko,
Yury Usachev |
March 15, 1996,
01:04 |
March 15, 1996,
06:55 |
5 h, 51 min |
Install 2nd Strela boom |
| 141. |
STS-76/Mir PE-21 |
Michael R. Clifford,
Linda Godwin |
March 27, 1996,
06:34 |
March 27, 1996,
12:36 |
6 h, 02 min |
Practice ISS assembly |
| 142. |
Mir PE-21 - EVA 2 |
Onufrienko,
Usachev |
May 20, 1996,
22:50 |
May 21, 1996,
04:10 |
5 h, 20 min |
Transfer MCSA to Kvant |
| 143. |
Mir PE-21 - EVA 3 |
Onufrienko,
Usachev |
May 24, 1996,
20:47 |
May 25, 1996,
02:30 |
5 h, 34 min |
Install MCSA on Kvant |
| 144. |
Mir PE-21 - EVA 4 |
Onufrienko,
Usachev |
May 30, 1996,
18:20 |
May 30, 1996,
22:40 |
4 h, 20 min |
Install MOMS to Priroda |
| 145. |
Mir PE-21 - EVA 5 |
Onufrienko,
Usachev |
June 6, 1996,
16:56 |
June 6, 1996,
20:30 |
3 h, 34 min |
Install micrometeoroid detectors |
| 146. |
Mir PE-21 - EVA 6 |
Onufrienko,
Usachev |
June 13, 1996,
12:45 |
June 13, 1996,
18:27 |
5 h, 42 min |
Install Ferma-3 on Kvant |
| 147. |
Mir PE-22 - EVA 1 |
Valery Korzun,
Kaleri |
December 2, 1996,
15:54 |
December 2, 1996,
21:52 |
5 h, 57 min |
Install solar array cables |
| 148. |
Mir PE-22 - EVA 2 |
Korzun,
Kaleri |
December 9, 1996,
13:50 |
December 9, 1996,
20:28 |
6 h, 36 min |
Attach Kurs docking antenna |
|
| 149. |
STS-82 - EVA 1 |
Lee,
Steven Smith |
February 14, 1997,
04:34 |
February 14, 1997,
11:16 |
6 h, 42 min |
HST repair |
| 150. |
STS-82 - EVA 2 |
Harbaugh,
Joseph R. Tanner |
February 15, 1997,
03:25 |
February 15, 1997,
10:52 |
7 h, 27 min |
HST repair |
| 151. |
STS-82 - EVA 3 |
Lee,
Steven Smith |
February 16, 1997,
02:53 |
February 16, 1997,
10:04 |
7 h, 11 min |
HST repair |
| 152. |
STS-82 - EVA 4 |
Harbaugh,
Tanner |
February 17, 1997,
03:45 |
February 17, 1997,
10:19 |
6 h, 34 min |
HST repair |
| 153. |
STS-82 - EVA 5 |
Lee,
Steven Smith |
February 18, 1997,
03:15 |
February 18, 1997,
08:32 |
5 h, 17 min |
HST repair |
| 154. |
Mir PE-23 - EVA 1 |
Tsibliyev,
Jerry Linenger |
April 29, 1997,
05:10 |
April 29, 1997,
10:09 |
4 h, 59 min |
Test Orlan-M spacesuit |
| 155. |
Mir PE-24 - EVA 1 |
A. Solovyov,
Pavel Vinogradov |
August 22, 1997,
11:14 |
August 22, 1997,
14:30 |
3 h, 16 min |
Inspect Spektr damage |
| 156. |
Mir PE-24 - EVA 2 |
A. Solovyov,
Foale |
September 6, 1997,
01:07 |
September 6, 1997,
07:07 |
6 h, 00 min |
Inspect Spektr damage |
| 157. |
STS-86 - EVA 1 |
Scott Parazynski,
Titov |
October 1, 1997,
|
October 1, 1997,
|
5 h, 01 min |
Retrieved MEEP from Mir |
| 158. |
Mir PE-24 - EVA 3 |
A. Solovyov,
Vinogradov |
October 20, 1997,
09:40 |
October 20, 1997,
16:18 |
6 h, 38 min |
EVA inside Spektr |
| 159. |
Mir PE-24 - EVA 4 |
A. Solovyov,
Vinogradov |
November 3, 1997,
03:32 |
November 3, 1997,
09:36 |
6 h, 04 min |
Dismantle solar panel |
| 160. |
Mir PE-24 - EVA 5 |
A. Solovyov,
Vinogradov |
November 6, 1997,
00:12 |
November 6, 1997,
06:24 |
6 h, 12 min |
Install solar panel |
| 161. |
STS-87 - EVA 1 |
Winston E. Scott,
Takao Doi |
November 25, 1997,
00:02 |
November 25, 1997,
07:45 |
7 h, 43 min |
Capture Spartan satellite |
| 162. |
STS-87 - EVA 2 |
W. Scott,
Doi |
December 3, 1997,
09:09 |
December 3, 1997,
14:09 |
4 h, 59 min |
Test ISS assembly tools |
|
| 163. |
Mir PE-24 - EVA 6 |
A. Solovyov,
Vinogradov |
January 8, 1998,
23:08 |
January 9, 1998,
02:14 |
3 h, 06 min |
Repair leaking EVA hatch |
| 164. |
Mir PE-24 - EVA 7 |
A. Solovyov,
David Wolf |
January 14, 1998,
21:12 |
January 14, 1998,
01:04 |
3 h, 52 min |
Inspect outside of Mir |
| 165. |
Mir PE-25 - EVA 1 |
Musabayev,
Budarin |
April 1, 1998,
13:35 |
April 1, 1998,
20:15 |
6 h, 40 min |
Repair solar panel |
| 166. |
Mir PE-25 - EVA 2 |
Musabayev,
Budarin |
April 6, 1998,
13:35 |
April 6, 1998,
17:50 |
4 h, 15 min |
Repair solar panel |
| 167. |
Mir PE-25 - EVA 3 |
Musabayev,
Budarin |
April 11, 1998,
09:55 |
April 11, 1998,
16:20 |
6 h, 25 min |
Remove Mir thruster engine |
| 168. |
Mir PE-25 - EVA 4 |
Musabayev,
Budarin |
April 17, 1998,
07:40 |
April 17, 1998,
14:13 |
6 h, 33 min |
Repair Mir thruster engine |
| 169. |
Mir PE-25 - EVA 5 |
Musabayev,
Budarin |
April 22, 1998,
05:34 |
April 22, 1998,
11:55 |
6 h, 21 min |
Replace Mir thruster engine |
| 170. |
Mir PE-26 - EVA 1 |
Gennady Padalka,
Avdeyev |
September 15, 1998,
20:00 |
September 15, 1998,
20:30 |
0 h, 30 min |
Repair solar array motor inside Spektr |
| 171. |
Mir PE-26 - EVA 2 |
Padalka,
Avdeyev |
November 10, 1998,
19:23 |
November 11, 1998,
01:18 |
5 h, 54 min |
Deploy satellite, mount experiments |
| 172. |
STS-88 - EVA 1 |
Jerry Ross,
James Newman |
December 7, 1998,
22:10 |
December 8, 1998,
05:31 |
7 h, 21 min |
Connect Unity Module cables to Zarya |
| 173. |
STS-88 - EVA 2 |
Ross,
Newman |
December 9, 1998,
20:33 |
December 10, 1998,
03:35 |
7 h, 02 min |
Install Unity antennas |
| 174. |
STS-88 - EVA 3 |
Ross,
Newman |
December 12, 1998,
20:33 |
December 13, 1998,
03:32 |
6 h, 59 min |
Install Unity EVA equipment |
|
| 175. |
Mir PE-27 - EVA 1 |
Afanasyev,
Jean-Pierre Haigneré |
April 16, 1999,
04:37 |
April 16, 1999,
10:56 |
6 h, 19 min |
Install experiments outside Mir |
| 176. |
STS-96 - EVA 1 |
Tamara E. Jernigan,
Barry |
May 30, 1999,
02:56 |
May 30, 1999,
10:51 |
7 h, 55 min |
Install cranes on ISS |
| 177. |
Mir PE-27 - EVA 2 |
Afanasyev,
Avdeyev |
July 23, 1999,
11:06 |
July 23, 1999,
17:13 |
6 h, 07 min |
Install communications antenna |
| 178. |
Mir PE-27 - EVA 3 |
Afanasyev,
Avdeyev |
July 28, 1999,
09:37 |
July 28, 1999,
14:59 |
5 h, 22 min |
Deploy communications antenna |
| 179. |
STS-103 - EVA 1 |
Steven Smith,
John Grunsfeld |
December 22, 1999,
18:54 |
December 23, 1999,
03:09 |
8 h, 15 min |
Service Hubble telescope |
| 180. |
STS-103 - EVA 2 |
Foale,
Claude Nicollier |
December 23, 1999,
19:06 |
December 24, 1999,
03:16 |
8 h, 10 min |
Service Hubble telescope |
| 181. |
STS-103 - EVA 3 |
Steven Smith,
Grunsfeld |
December 24, 1999,
19:17 |
December 25, 1999,
03:25 |
8 h, 08 min |
Service Hubble telescope |
|
| 182. |
Mir PE-28 - EVA 1 |
Sergei Zalyotin,
Kaleri |
May 12, 2000,
10:44 |
May 12, 2000,
15:47 |
5 h, 03 min |
Inspect Mir space station |
| 183. |
STS-101 - EVA 1 |
James Voss,
Jeffrey Williams |
May 22, 2000,
01:48 |
May 22, 2000,
08:32 |
6 h, 44 min |
Repair cranes on ISS |
| 184. |
STS-106 - EVA 1 |
Edward Lu,
Yuri Malenchenko |
September 11, 2000,
04:47 |
September 11, 2000,
11:01 |
6 h, 14 min |
Install magnetometer and boom |
| 185. |
STS-92 - EVA 1 |
Chiao,
William McArthur |
October 15, 2000,
14:27 |
October 15, 2000,
20:55 |
6 h, 28 min |
Connect cables & install antennas |
| 186. |
STS-92 - EVA 2 |
Michael Lopez-Alegria,
Wisoff |
October 16, 2000,
14:15 |
October 16, 2000,
21:22 |
7 h, 07 min |
Install PMA-3 docking port |
| 187. |
STS-92 - EVA 3 |
Chiao,
McArthur |
October 17, 2000,
14:30 |
October 17, 2000,
21:18 |
6 h, 48 min |
Install Z1 truss on Unity |
| 188. |
STS-92 - EVA 4 |
Lopez-Alegria,
Wisoff |
October 18, 2000,
15:00 |
October 18, 2000,
21:56 |
6 h, 56 min |
Finish up Z1 install |
| 189. |
STS-97 - EVA 1 |
Tanner,
Carlos I. Noriega |
December 3, 2000,
18:35 |
December 4, 2000,
02:08 |
7 h, 33 min |
P6 solar array to Z1 |
| 190. |
STS-97 - EVA 2 |
Tanner,
Noriega |
December 5, 2000,
17:21 |
December 5, 2000,
23:58 |
6 h, 37 min |
Install/activate P6 solar array |
| 191. |
STS-97 - EVA 3 |
Tanner,
Noriega |
December 7, 2000,
16:13 |
December 7, 2000,
21:23 |
5 h, 10 min |
Install electrical probes |
|
| 192. |
STS-98 - EVA 1 |
Thomas D. Jones,
Robert Curbeam |
February 10, 2001,
15:50 |
February 10, 2001,
23:24 |
7 h, 34 min |
Install connect Destiny to Unity |
| 193. |
STS-98 - EVA 2 |
Jones,
Curbeam |
February 12, 2001,
15:59 |
February 12, 2001,
22:49 |
6 h, 50 min |
Install PMA 2 on Destiny |
| 194. |
STS-98 - EVA 3 |
Jones,
Curbeam |
February 14, 2001,
14:48 |
February 14, 2001,
20:13 |
5 h, 25 min |
Install antenna, release radiator |
| 195. |
STS-102 - EVA 1 |
James Voss,
Susan Helms |
March 11, 2001,
05:12 |
March 11, 2001,
14:08 |
8 h, 56 min |
Prepare docking port for Leonardo |
| 196. |
STS-102 - EVA 2 |
Andrew Thomas,
Paul W. Richards |
March 13, 2001,
05:23 |
March 13, 2001,
11:44 |
6 h, 21 min |
Install spare ammonia coolant pump |
| 197. |
STS-100 - EVA 1 |
Chris Hadfield,
Scott Parazynski |
April 22, 2001,
11:45 |
April 22, 2001,
18:55 |
7 h, 10 min |
UHF antenna, Canadarm2 install; 1st Canadian spacewalk |
| 198. |
STS-100 - EVA 2 |
Hadfield,
Parazynski |
April 24, 2001,
12:34 |
April 24, 2001,
20:14 |
7 h, 40 min |
Canadarm2 checkouts |
| 199. |
ISS Expedition 2
EVA 1 |
Usachev,
James Voss |
June 8, 2001,
14:21 |
June 8, 2001,
14:40 |
0 h, 19 min |
Transfer docking cone |
| 200. |
STS-104 - EVA 1 |
Gernhardt,
James Reilly |
July 15, 2001,
03:10 |
July 15, 2001,
09:09 |
5 h, 59 min |
Install Quest airlock on ISS |
| 201. |
STS-104 - EVA 2 |
Gernhardt,
Reilly |
July 18, 2001,
03:04 |
July 18, 2001,
09:33 |
6 h, 29 min |
Install first 2 gas tanks to airlock |
| 202. |
STS-104 - EVA 3 |
Gernhardt,
Reilly |
July 21, 2001,
04:35 |
July 21, 2001,
08:37 |
4 h, 02 min |
Install final 2 gas tanks to airlock |
| 203. |
STS-105 - EVA 1 |
Daniel Barry,
Patrick Forrester |
August 16, 2001,
13:58 |
August 16, 2001,
20:14 |
6 h, 16 min |
Ammonia servicer install |
| 204. |
STS-105 - EVA 2 |
Barry,
Forrester |
August 18, 2001,
13:42 |
August 18, 2001,
19:11 |
5 h, 29 min |
Install handrails on Destiny lab |
| 205. |
ISS Expedition 3
EVA 1 |
Dezhurov,
Mikhail Tyurin |
October 8, 2001,
14:24 |
October 8, 2001,
19:22 |
4 h, 58 min |
Install cables between Pirs and Zvezda |
| 206. |
ISS Expedition 3
EVA 2 |
Dezhurov,
Tyurin |
October 15, 2001,
09:17 |
October 15, 2001,
15:08 |
5 h, 51 min |
Installed experiment on Zvezda |
| 207. |
ISS Expedition 3
EVA 3 |
Dezhurov,
Frank Culbertson |
November 12, 2001,
21:41 |
November 13, 2001,
02:46 |
5 h, 05 min |
Install cables between Pirs and Zvezda |
| 208. |
ISS Expedition 3
EVA 4 |
Dezhurov,
Tyurin |
December 3, 2001,
13:20 |
December 3, 2001,
16:06 |
2 h, 46 min |
Repair Progress docking ring |
| 209. |
STS-108 - EVA 1 |
Godwin,
Daniel Tani |
December 10, 2001,
17:52 |
December 10, 2001,
22:04 |
4 h, 12 min |
Installed insulating blankets |
|
| 210. |
ISS Expedition 4
EVA 1 |
Onufrienko,
Walz |
January 14, 2002,
20:59 |
January 14, 2002,
03:02 |
6 h, 03 min |
Installed ham radio antenna on Zvezda |
| 211. |
ISS Expedition 4
EVA 2 |
Onufrienko,
Daniel Bursch |
January 25, 2002,
15:19 |
January 25, 2002,
2118 |
5 h, 59 min |
Installed 2nd ham radio antenna on Zvezda |
| 212. |
ISS Expedition 4
EVA 3 |
Walz,
Bursch |
February 20, 2002,
11:38 |
February 20, 2002,
17:25 |
5 h, 47 min |
Installed cables, tightened tank clamps |
| 213. |
STS-109 - EVA 1 |
Grunsfeld,
Richard Linnehan |
March 4, 2002,
06:37 |
March 4, 2002,
13:38 |
7 h, 01 min |
Replace starboard solar array |
| 214. |
STS-109 - EVA 2 |
Newman,
Michael Massimino |
March 5, 2002,
06:40 |
March 5, 2002,
13:56 |
7 h, 16 min |
Replace port solar array and Reaction Wheel Assembly (RWA) |
| 215. |
STS-109 - EVA 3 |
Grunsfeld,
Linnehan |
March 6, 2002,
08:28 |
March 6, 2002,
15:16 |
6 h, 48 min |
Replace Power Control Unit (PCU) |
| 216. |
STS-109 - EVA 4 |
Newman,
Massimino |
March 7, 2002,
09:00 |
March 7, 2002,
16:30 |
7 h, 30 min |
Replace Faint Object Camera with a new Advanced Camera for Surveys (ACS) |
| 217. |
STS-109 - EVA 5 |
Grunsfeld,
Linnehan |
March 8, 2002,
08:46 |
March 8, 2002,
16:06 |
7 h, 20 min |
Replace Cryocooler for NICMOS |
| 218. |
STS-110 - EVA 1 |
Steven Smith,
Rex Walheim |
April 11, 2002,
14:36 |
April 11, 2002,
22:24 |
7 h, 48 min |
Installed S0 Truss on Destiny |
| 219. |
STS-110 - EVA 2 |
Ross,
Lee Morin |
April 13, 2002,
14:09 |
April 13, 2002,
21:39 |
7 h, 30 min |
Continued S0 Truss install |
| 220. |
STS-110 - EVA 3 |
Steven Smith,
Walheim |
April 14, 2002,
13:48 |
April 14, 2002,
20:15 |
6 h, 27 min |
Reconfigure Canadarm2 for S0 truss |
| 221. |
STS-110 - EVA 4 |
Ross,
Morin |
April 16, 2002,
14:29 |
April 16, 2002,
21:06 |
6 h, 37 min |
Install future EVA hardware |
| 222. |
STS-111 - EVA 1 |
Franklin Chang-Diaz,
Philippe Perrin |
June 9, 2002,
15:27 |
June 9, 2002,
22:41 |
7 h, 14 min |
Installed P6 Truss |
| 223. |
STS-111 - EVA 2 |
Chang-Diaz,
Perrin |
June 11, 2002,
15:27 |
June 11, 2002,
22:41 |
5 h, 00 min |
Connected cables |
| 224. |
STS-111 - EVA 3 |
Chang-Diaz,
Perrin |
June 13, 2002,
15:16 |
June 13, 2002,
22:33 |
7 h, 17 min |
Replace Canadarm2 wrist joint |
| 225. |
ISS Expedition 5
EVA 1 |
Korzun,
Peggy Whitson |
August 16, 2002,
09:25 |
August 16, 2002,
1348 |
4 h, 23 min |
Installed Strela boom on Pirs |
| 226. |
ISS Expedition 5
EVA 2 |
Korzun,
Sergei Treshchev |
August 26, 2002,
05:27 |
August 26, 2002,
10:48 |
5 h, 21 min |
Installed EVA hardware on Zarya |
| 227. |
STS-112 - EVA 1 |
Wolf,
Piers Sellers |
October 10, 2002,
15:21 |
October 10, 2002,
22:22 |
7 h, 01 min |
Installed lines between S0 and S1 trusses |
| 228. |
STS-112 - EVA 2 |
Wolf,
Sellers |
October 12, 2002,
14:31 |
October 12, 2002,
20:35 |
6 h, 04 min |
Installed future EVA hardware |
| 229. |
STS-112 - EVA 3 |
Wolf,
Sellers |
October 14, 2002,
14:08 |
October 14, 2002,
20:44 |
6 h, 36 min |
Completed S1 install |
| 230. |
STS-113 - EVA 1 |
Lopez-Alegria,
John Herrington |
November 26, 2002,
19:49 |
November 27, 2002,
02:34 |
6 h, 45 min |
Install P1 truss |
| 231. |
STS-113 - EVA 2 |
Lopez-Alegria,
Herrington |
November 28, 2002,
18:36 |
November 29, 2002,
00:46 |
6 h, 10 min |
Install TV cameras, move CETA |
| 232. |
STS-113 - EVA 3 |
Lopez-Alegria,
Herrington |
November 30, 2002,
19:25 |
December 1, 2002,
02:25 |
7 h, 00 min |
Inspect Mobile Transporter |
|
| 233. |
ISS Expedition 6
EVA 1 |
Kenneth Bowersox,
Donald Pettit |
January 15, 2003,
12:50 |
January 15, 2003,
19:41 |
6 h, 51 min |
Released P1 truss radiator system |
| 234. |
ISS Expedition 6
EVA 2 |
Bowersox,
Pettit |
April 8, 2003,
12:40 |
April 8, 2003,
19:06 |
6 h, 26 min |
Moved cables between S0, S1 and P1 Trusses |
|
| 235. |
ISS Expedition 8
EVA 1 |
Foale,
Kaleri |
February 26, 2004,
21:17 |
February 27, 2004,
01:12 |
3 h, 55 min |
Installed and removed experiments |
| 236. |
ISS Expedition 9
EVA 1 |
Padalka,
Edward Fincke |
June 24, 2004,
21:57 |
June 24, 2004,
22:10 |
0 h, 13 min |
EVA cut short due to loss of pressure in Fincke's oxygen tank |
| 237. |
ISS Expedition 9
EVA 2 |
Padalka,
Finke |
June 30, 2004,
21:19 |
July 1, 2004,
02:59 |
5 h, 40 min |
Serviced ISS gyroscope |
| 238. |
ISS Expedition 9
EVA 3 |
Padalka,
Finke |
August 3, 2004,
06:58 |
August 3, 2004,
11:28 |
4 h, 30 min |
Installed 2 antennas, replaced 3 laser reflectors |
| 239. |
ISS Expedition 9
EVA 4 |
Padalka,
Finke |
September 3, 2004,
16:43 |
September 3, 2004,
22:04 |
5 h, 20 min |
Installed ATV docking antennas |
|
| 240. |
ISS Expedition 10
EVA 1 |
Chiao,
Salizhan Sharipov |
January 26, 2005,
07:43 |
January 26, 2005,
13:11 |
5 h, 28 min |
External outfitting of Zvezda. |
| 241. |
ISS Expedition 10
EVA 2 |
Chiao,
Sharipov |
March 28, 2005,
06:25 |
March 28, 2005,
11:31 |
5 h, 06 min |
Prepare ISS for European ATV docking, in-space launch of a small Russian satellite. |
| 242. |
STS-114
EVA 1 |
Soichi Noguchi,
Stephen Robinson |
July 30, 2005,
05:46 |
July 30, 2005,
12:36 |
6 h, 50 min |
Demonstrate repair techniques on the Shuttle's protective tiles. |
| 243. |
STS-114
EVA 2 |
Noguchi,
Robinson |
August 1, 2005,
04:44 |
August 1, 2005,
11:58 |
7 h, 14 min |
Replace Control Moment Gyroscope on ISS. |
| 244. |
STS-114
EVA 3 |
Noguchi,
Robinson |
August 3, 2005,
04:14 |
August 3, 2005,
10:15 |
6 h, 01 min |
Repair Heat Shield of Space Shuttle Discovery. |
| 245. |
ISS Expedition 11
EVA 1 |
Sergei Krikalev,
John L. Phillips |
August 18, 2005,
19:02 |
August 19, 2005,
00:00 |
4 h, 58 min |
Retrieve several experiments, install television camera for new docking procedure. |
| 246. |
ISS Expedition 12
EVA 1 |
William McArthur,
Valery Tokarev |
November 7, 2005,
15:32 |
November 7, 2005,
20:54 |
5 h, 22 min |
Install and setup P1 Truss Camera, failed remote joint motor controller retrieval, Floating Potential Probe jettison, removal and replacement of a remote power controller module on Mobile Transporter. |
|
| 247. |
ISS Expedition 12
EVA 2 |
MacArthur,
V. Tokarev |
February 3, 2006,
9:55 |
February 3, 2006,
16:27 |
5 h, 43 min |
Released SuitSat-1, retrieved the Biorisk experiment, photographed a sensor for a micrometeoroid experiment and tied off the surviving umbilical of the mobile transporter |
| 248. |
ISS Expedition 13
EVA 1 |
Pavel Vinogradov,
Jeffrey Williams |
June 1, 2006
23:48 |
June 2, 2006
06:19 |
6 h, 31 min |
Repair of a vent for the Elektron unit, replacing camera on assembly platform and retrieval of experiment results. |
| 249. |
STS-121
EVA 1 |
Piers Sellers,
Michael E. Fossum |
July 8, 2006
13:17 |
July 8, 2006
20:48 |
7 h, 31 min |
Block the cutter blade on the station’s mobile transporter, test the shuttle arm's ability to be used as a platform for astronauts who would conduct heat shield repairs. |
| 250. |
STS-121
EVA 2 |
Sellers,
Fossum |
July 10, 2006
7:14 |
July 10, 2006
14:01 |
6 h, 47 min |
Restored the International Space Station’s Mobile Transporter rail car to full operation and delivered a spare pump module for the station’s cooling system. |
| 251. |
STS-121
EVA 3 |
Sellers,
Fossum |
July 12, 2006
6:20 |
July 12, 2006
13:31 |
7 h, 11 min |
Test shuttle repair methods featuring RCCs. |
| 252. |
ISS Expedition 13
EVA 2 |
Jeffrey Williams,
Thomas Reiter |
August 3, 2006
14:04 |
August 3, 2006
19:58 |
5 h, 54 min |
Installation of the Thermal Rotary Joint Motor Controller and the replacement of the STR MDM. |
| 253. |
STS-115
EVA 1 |
Joe Tanner,
Heidemarie Stefanyshyn-Piper |
September 12, 2006
10:17 |
September 12, 2006
15:43 |
5 h, 26 min |
Installation of the P3/4 truss on ISS. |
| 254. |
STS-115
EVA 2 |
Dan Burbank,
Steven MacLean |
September 13, 2006
9:05 |
September 13, 2006
16:16 |
7 h, 11 min |
Installation of the P3/4 truss on ISS. |
| 255. |
STS-115
EVA 3 |
Tanner,
Stefanyshyn-Piper |
September 15, 2006
10:00 |
September 15, 2006
16:42 |
6 h, 42 min |
Installation of radiator on the P3/4 truss on ISS. |
| 256. |
Expedition 14
EVA 1 |
Tyurin,
Michael Lopez-Alegria |
November 22, 2006
23:17 |
November 23, 2006
04:55 |
5 h, 39 min |
Installed BTN neutron experiment, relocated a WAL antenna, inspected Kurs antenna, golf shot |
| 257. |
STS-116
EVA 1 |
Robert Curbeam,
Christer Fuglesang |
December 12, 2006
20:31 |
December 13, 2006
03:07 |
6 h, 36 min |
Installation of ISS P5 Truss Segment, replacement of video camera on S1 truss. |
| 258. |
STS-116
EVA 2 |
Curbeam,
Fuglesang |
December 14, 2006
19:41 |
December 15, 2006
00:41 |
5 h, 00 min |
Rewiring of ISS electrical system, circuits 2/3. |
| 259. |
STS-116
EVA 3 |
Curbeam,
Sunita Williams |
December 16, 2006
19:25 |
December 17, 2006
02:57 |
7 h, 31 min |
Rewiring of ISS electrical system, circuits 1/4. Additional time spent trying to help retract balky Solar Array Wing. Suni Williams becomes the 9th woman to perform an EVA. |
| 260. |
STS-116
EVA 4 |
Curbeam,
Fuglesang |
December 18, 2006
19:00 |
December 19, 2006
01:38 |
6 h, 38 min |
EVA to help retract balky Solar Array Wing. |
|
| 261. |
Expedition 14
EVA 2 |
Lopez-Alegria,
S. Williams |
January 31, 2007
15:14 |
January 31, 2007
23:09 |
7 h, 55 min |
EVA to reroute ISS cooling lines. |
| 262. |
Expedition 14
EVA 3 |
Lopez-Alegria,
S. Williams |
February 4, 2007
13:38 |
February 4, 2007
20:49 |
7 h, 11 min |
EVA to reroute ISS cooling lines. |
| 263 |
Expedition 14
EVA 4 |
Lopez-Alegria,
S. Williams |
February 8, 2007
13:26 |
February 8, 2007
20:06 |
6 h, 40 min |
|
| 264 |
Expedition 14
EVA 5 |
Lopez-Alegria,
Mikhail Tyurin |
February 22, 2007
10:28 |
February 22, 2007
16:45 |
6 h, 18 min |
Retract faulty antenna on docked Progress spacecraft |
| 265 |
Expedition 15
EVA 1 |
Oleg Kotov,
Fyodor Yurchikhin |
May 30, 2007
19:05 |
May 31, 2007
00:30 |
5 h, 25 min |
|
| 266 |
Expedition 15
EVA 2 |
Kotov,
Yurchikhin |
June 6, 2007
14:23 |
June 6, 2007
20:00 |
5 h, 37 min |
|
| 267. |
STS-117
EVA 1 |
James F. Reilly,
John D. Olivas |
June 11, 2007
20:02 |
June 12, 2007
02:17 |
6 h, 15 min |
EVA to install ISS S3/S4 Truss |
| 268. |
STS-117
EVA 2 |
Patrick G. Forrester,
Steven Swanson |
June 13, 2007
18:28 |
June 14, 2007
01:44 |
7 h, 16 min |
Assist in retraction of solar panels on P6 Truss. Complete S3/S4 truss installation. Partial failure due to problems with the SARJ |
| 269. |
STS-117
EVA 3 |
Reilly,
Olivas |
June 15, 2007
17:24 |
June 16, 2007
01:22 |
7 h, 58 min |
OMS pod thermal insulation repair, finish P6 array retraction, installation of hydrogen valve on Destiny |
| 270. |
STS-117
EVA 4 |
Forrester,
Swanson |
June 17, 2007
16:25 |
June 17, 2007
22:54 |
6 h, 29 min |
Finish install rotary joint for solar panels, install camera stanchion and computer network cable, secure debris shield |
| 271 |
Expedition 15
EVA 3 |
Clayton Anderson,
Fyodor Yurchikhin |
July 23, 2007
10:25 |
July 23, 2007
18:06 |
7 h, 41 min |
Replaced component for mobile transporter; jettisoned ammonia tank and flight support equipment; cleaned CBM on nadir Unity port.[5][6] |
| 272 |
STS-118
EVA 1 |
Richard Mastracchio, Dafydd Williams |
August 11, 2007
16:28 |
August 11, 2007
22:45 |
6 h, 17 min |
Installation of ISS S5 truss and retract radiator |
| 273 |
STS-118
EVA 2 |
Mastracchio, D. Williams |
August 13, 2007
15:32 |
August 13, 2007
22:00 |
6 h, 28 min |
Replace failed ISS gyroscope |
| 274 |
STS-118
EVA 3 |
Mastracchio, Clayton Anderson |
August 15, 2007
14:37 |
August 15, 2007
20:05 |
5 h, 28 min |
SASA relocation; CETA Cart relocation; P6 Transponder retrieval. S-band antenna relocation from P6 to P1. Exposed experiment retrievals also scheduled, but cancelled after damage to Mastracchio's gloves caused EVA to be aborted. |
| 275 |
STS-118
EVA 4 |
D. Williams, C. Anderson |
August 18, 2007
14:17 |
August 18, 2007
19:02 |
5 h, 2 min |
OBSS Boom Stand Installation; MISSE retrieval; EWIS Antenna Installation; Secured Z1 gimbal locks |
| 276 |
STS-120
EVA 1 |
Scott Parazynski,
Douglas Wheelock |
October 26, 2007
10:02 |
October 26, 2007
16:16 |
6 h, 14 min |
Harmony (Node 2) installation, S-Band Antenna Support Assembly (SASA) retrieval, P6/Z1 fluid line disconnections. |
| 277 |
STS-120
EVA 2 |
Parazynski,
Daniel M. Tani |
October 28, 2007
09:32 |
October 28, 2007
16:05 |
6h, 33min |
Z1 to P6 umbilical disconnections, P6 detach from Z1, S1 radiator configuration, Node 2 handrail installations, S4 starboard Solar Alpha Rotary Joint (SARJ) inspection. |
| 278 |
STS-120
EVA 3 |
Parazynski,
Wheelock |
October 30, 2007
08:45 |
October 30, 2007
15:53 |
7 hours, 08 minutes |
P6 to P5 attachment. P6/P5 umbilical connections, S1 configure post-redeploy, port SARJ inspection. |
| 279 |
STS-120
EVA 4 |
Parazynski,
Wheelock |
November 3, 2007
10:03 |
November 3, 2007
17:22 |
7 hours, 19 minutes |
Inspection and repair of P6 Solar Array. |
| 280 |
Expedition 16
EVA 1 |
Peggy Whitson,
Yuri Malenchenko |
November 9, 2007
09:54 |
November 9, 2007
16:49 |
6 hours, 55 minutes |
SSPTS cable disconnect and stowage, PMA-2 umbilical stowage, Node 2 avionics umbilical temp stowed. |
| 281 |
Expedition 16
EVA 2 |
Whitson,
Daniel M. Tani |
November 20, 2007
10:10 |
November 20, 2007
17:26 |
7 hours, 16 minutes |
External configuration of PMA-2 and Harmony: Fluid, electrical, and data line hookups, avionics line hookup, heater cable hookups, Fluid tray relocation. |
| 282 |
Expedition 16
EVA 3 |
Whitson,
Tani |
November 24, 2007
09:50 |
November 24, 2007
16:54 |
7 hours, 04 minutes |
Completion of fluid, electrical, and data line hookups for PMA-2 and Harmony. Loop B Fluid Tray connection to port side of Destiny. Photographic analysis of starboard Solar Alpha Rotary Joint to assist with troubleshooting on the ground. |
| 283 |
Expedition 16
EVA 4 |
Whitson,
Tani |
December 18, 2007
09:50 |
December 18, 2007
16:46 |
6 hours, 56 minutes |
Inspection of the S4 starboard Solar Alpha Rotary Joint (SARJ), and a Beta Gimbal Assembly (BGA). The EVA is the 100th in support of building the International Space Station.[7] Records: 100th EVA in support of assembly and maintenance of the International Space Station.[8][9][10] |
|
| 284. |
Expedition 16
EVA 5 |
Whitson
Tani |
January 30, 2008
09:56 |
January 30, 2008
17:06 |
7 hours, 10 minutes |
EVA - Replaced the Bearing Motor Roll Ring Module on one of the ISS's solar wings. |
| 285. |
STS-122
EVA1 |
Rex J. Walheim
Stanley G. Love |
February 11, 2008
14:13 |
February 11, 2008
22:11 |
7 hours, 58 minutes |
EVA - Columbus power data grapple fixture installation, P1 truss nitrogen (N2) tank assembly preparation, power and data grapple fixture removal and installation to Columbus. |
| 286. |
STS-122
EVA2 |
Walheim
Hans Schlegel |
February 13, 2008
14:27 |
February 13, 2008
21:12 |
6 hours, 45 minutes |
EVA - P1 Truss Nitrogen (N2) tank assembly installation, stowage of old N2 tank assembly into payload bay, Station-to-Shuttle Power Transfer System (SSPTS) routing. |
| 287. |
STS-122
EVA3 |
Walheim
Love |
February 15, 2008
13:07 |
February 15, 2008
20:32 |
7 hours, 25 minutes |
EVA - Installation of SOLAR telescope, and EuTEF facility onto an External Stowage Platform (ESP) on Columbus, retrieval of failed Control Moment Gyroscope (CMG), installation of failed CMG into payload bay, installation of keel pin cloth covers on Columbus. |
| 288. |
STS-123
EVA 1 |
Richard M. Linnehan
Garrett E. Reisman |
March 14, 2008
01:18 |
March 14, 2008
08:19 |
7 hours, 1 minute |
Installation of ELM-PS and Dextre assembly. |
| 289. |
STS-123
EVA 2 |
Linnehan
Michael J. Foreman |
March 15, 2008
23:49 |
March 16, 2008
06:57 |
7 hours, 8 minutes |
Dextre assembly (cont.). |
| 290. |
STS-123
EVA 3 |
Linnehan
Robert L. Behnken |
March 17, 2008
22:51 |
March 18, 2008
05:44 |
6 hours, 53 minutes |
Dextre assembly (cont.), prepare the Spacelab Logistics Pallet for landing, transfer a spare Canadarm2 yaw join, transfer two spare Direct Current Switching Units Mission and unsuccessful attempted installation of the MISSE 6 experiment on the exterior of the Columbus module. |
| 291. |
STS-123
EVA 4 |
Behnken
Foreman |
March 20, 2008
22:04 |
March 21, 2008
04:28 |
6 hours, 24 minutes |
Replacement of Remote Power Control Module and test of tile repair material. Removal of a sock covering the left hand of Dextre and some launch locks on Harmony. Release launch locks on Harmony’s port and nadir Common Berthing Mechanisms |
| 292. |
STS-123
EVA 5 |
Behnken
Foreman |
March 22, 2008
20:34 |
March 23, 2008
02:36 |
6 hours, 02 minutes |
Storage of Shuttle Orbiter Boom Sensor System on the Station, installation of ELM‐PS trunnion covers, removed five covers from the starboard SARJ and performed inspections, captured digital photography, successful installation of the MISSE 6 experiment on the exterior of the Columbus module and debris collection. |
|
| 293. |
STS-124
EVA 1 |
Ronald J. Garan, Jr.
Michael E. Fossum |
June 3, 2008
16:22 |
June 3, 2008
23:10 |
6 hours, 48 minutes |
Release straps on shuttle robotic arm elbow joint camera. Transfer OBSS back to the shuttle. Prepare Kibō for installation. Replace trundle bearing assembly on the starboard solar alpha rotary joint (SARJ). Inspect damage to SARJ. Test cleaning methods for use on the SARJ race ring. |
| 294. |
STS-124
EVA 2 |
Garan
Fossum |
2008-06-05
15:04 |
2008-06-05
22:15 |
7 hours, 11 minutes[11] |
Installation of covers and external television equipment on the JEM and preparation of RMS. Preparation for relocation of ELM-PS. Prepare a depleted nitrogen tank assembly for removal and a new one stowed on an external stowage platform for installation. Remove television camera with a failed power supply.[12] |
| 295. |
STS-124
EVA 3 |
Garan
Fossum |
2008-06-08
13:55 |
2008-06-08
20:28 |
6 hr 33 min |
Remove and replace starboard nitrogen tank assembly. Finish outfitting of Kibō laboratory. Reinstall removed television camera with repaired power supply. [12] |
|
| 296. |
Expedition 17
EVA 1 |
Sergei Volkov
Oleg Kononenko |
2008-07-10
18:48 |
2008-07-11
1:06 |
6 hr 18 min |
Remove pyrotechnic bolt from docked Soyuz[13] |
| 297. |
Expedition 17
EVA 2 |
Volkov
Kononenko |
2008-07-15
17:08 |
2008-07-15
23:02 |
5 hr 54 min |
Installation of a docking target on the Zvezda service module. Installation of Vsplesk experiment. Straightening of ham radio antenna. Retrieval of Biorisk experiment.[14] |
| 298. |
Shenzhou 7 EVA |
Zhai Zhigang,
Liu Boming (Stand up only) |
2008-09-27
08:45 |
2008-09-27
08:59 |
0 hr 14 min |
First EVA conducted by China |
- For recent and planned EVAs, see Extra-vehicular activity.
[edit] Gallery
[edit] References
|